Strong Winds Hit Haiyangshiyou 113

Thursday, November 12, 2009

CNOOC Limited announced that the Floating, Production, Storage and Offloading (FPSO) vessel Haiyangshiyou 113 shifted from its moorings by strong winds in the Bohai Bay area, has been safely secured. There were no injuries or oil spills.

Operations at the BZ25-1/BZ25-1South oilfields were shut-in on November 10 as a safety precaution during the strong winds, and recovery activities are now being remobilized

BZ25-1/BZ25-1South oilfield is a joint project developed with Chevron. CNOOC Ltd. holds 83.8% of interest and acts as the Operator. Before this incident, the production capacity of BZ25-1/BZ25-1South oilfield was approximately 27,000 barrels per day.

The company maintains appropriate insurance coverage of the operations related to the oilfield.

(www.cnoocltd.com)

Email AddThis Feed Button Share
Maritime Reporter January 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Kvaerner Wins Hild Jacket Contract

Total E&P Norge AS has awarded Kvaerner an EPSC-contract (Engineering, Procurement, Supply and Construction) of close to NOK 1.2 billion for delivery of a steel

ST Engineering Wins $60m Shipbuilding Contracts

Singapore Technologies Engineering Ltd (ST Engineering) reports that its marine arm, ST Marine, has won two shipbuilding contracts worth about $60m from Swire Pacific

OIG Makes Executive Appointments

Offshore Installation Group said that Steve Preston will join the company in the position of Chief Executive Officer and John Smith will join the company as Executive Vice Chairman.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright