Northrop Grumman Awarded $1.94B Contract

Wednesday, November 30, 2005
File
The U.S. Navy has awarded Northrop Grumman Corporation a contract valued at approximately $1.94 billion for the refueling and complex overhaul of the aircraft carrier USS Carl Vinson (CVN 70).

The work will be performed by the company’s Newport News sector and will include the refueling of the ship’s reactors, as well as extensive modernization work to more than 2,300 compartments and hundreds of systems. In addition, nearly 3,000 valves will be replaced and another 600 will be overhauled in various ship systems. Major upgrades will be made to the flight deck, catapults, combat systems and the island. The top two levels of the island will be removed and replaced with a reconfigured structure to provide enhanced operability and support a new antenna mast designed for more modern sensors. “This project is very large and complex, and requires a tremendous Newport News and Navy team effort,” said Ken Mahler, vice president of aircraft carrier overhauls for Northrop Grumman Newport News. “We’ll touch almost every piece of the ship, refurbishing existing equipment and installing the latest advancements in technology to increase and modernize Vinson’s capabilities and mission effectiveness when she returns to the fleet for another 23 years of service.”

Work is scheduled to last more than three years and will be the ship's one and only refueling and complex overhaul in a 50-year life span. Vinson is the third ship of the Nimitz class to undergo this major life-cycle milestone. The ship arrived at the company’s Newport News sector on Nov. 11. More than 3,500 Northrop Grumman Newport News employees will be working aboard Vinson during peak periods of the project. Named for former U.S. Rep. Carl Vinson, the carrier Vinson was built at Northrop Grumman Newport News and christened in 1980. The congressman attended the christening ceremony at age 96 and became the first living American to have a Navy ship named in his honor. The ship was commissioned by the Navy in 1982.

Email AddThis Feed Button Share
Maritime Reporter May 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Statoil Charters Three LWI Vessels

Statoil strengthening increased recovery from subsea wells Statoil has awarded contracts for new light well intervention (LWI) vessels. These “category

MarineCFO raises the bar for OMC

Offshore Marine Contractors to implement MarineCFO Enterprise Software. MarineCFO Inc., a provider of Marine Software including On-Vessel, Marine Operations,

GD Wins $7m for Submarine Work

General Dynamics Electric Boat has been awarded a $6.8 million U.S. Navy contract modification to design and procure a common controller for various shipboard functions on Virginia-class submarines.

Shipbuilding

What’s Next?

The maritime industry goes from cycle to cycle, living with and by uncertainty. You could even say that our industry embraces risk. This means that “What’s

Five Minutes with Bill Clifford, President, BAE Systems Ship Repair

We recently spent some time with Bill Clifford, President, BAE Systems Ship Repair, to discuss his views How did you come to your current position? Clifford   

Ribcraft Builds 6.8M RIBS for Fugro Seacore

British boat manufacturer Ribcraft will officially hand over the second in a batch of specially built 6.8M RIBS to overwater Marine Drilling Contractor Fugro Seacore at Seawork 2012.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright

Time taken: 0.0382 sec (26 req/sec)