NASSCO Gets $578M Option T-AKE’s

Wednesday, January 28, 2004
National Steel and Shipbuilding Co. San Diego, Calif., is being awarded a $578,206,817 fixed-price-incentive modification under previously awarded contract (N00024-02-C-2300) to exercise options for design and construction of the fifth and sixth ships in the Dry Cargo/Ammunition Ship (T-AKE) Class. This modification will provide for full funding of the detailed design and construction of the fifth and sixth ships of the T-AKE 1 Class. Work will be performed in San Diego, Calif., and is expected to be completed by July 2007. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington Navy Yard, Washington, D.C. is the contracting activity.
Email AddThis Feed Button Share
Maritime Reporter May 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

MarineCFO raises the bar for OMC

Offshore Marine Contractors to implement MarineCFO Enterprise Software. MarineCFO Inc., a provider of Marine Software including On-Vessel, Marine Operations,

GD Wins $7m for Submarine Work

General Dynamics Electric Boat has been awarded a $6.8 million U.S. Navy contract modification to design and procure a common controller for various shipboard functions on Virginia-class submarines.

Graig Wins Suezmax Supervision Contract

Graig secures ten-vessel supervision contract for Global Union suezmax newbuildings.   Graig China Ltd (GCL), part of the Cardiff-based Graig Group, has

Salvage

Disabled Bulk Ship Drifted Near Great Barrier Reef

The Australian Maritime Safety Authority (AMSA) provided assistance to a drifting bulk carrier in the Coral Sea before tugs arrived The Hong Kong-flagged bulk carrier,

Costa Concordia Removal Plan Presented Today In Rome

With Costa Concordia Emergency Commissioner Franco Gabrielli in attendance, Costa Crociere S.p.A. and Italo-American consortium Titan-Micoperi, the winner of the

Wrecked Russian Cruiser 'Drydocked'

Russian cruiser sealed off from the sea to allow final demolition An excavation pier around the Russian warship Murmansk that took three years to build has now been sealed,

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Sonar
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright

Time taken: 0.0324 sec (31 req/sec)