MTNW Supports Frontier Drilling

Sunday, October 11, 2009
File Photo courtesy Measurement Technology NW
Photo courtesy Measurement Technology NW

Measurement Technology NW (MTNW) has recently completed a contract to provide installation, calibration and commissioning on an eight-point mooring monitoring system for Frontier’s drill ship, Duchess, off the coast of Nigeria. The new running line tensiometer and LCI-90 mooring monitoring system provides visibility into line tensions which will support mooring and rig movement monitoring.

The Duchess is a 475 ft by 75 ft vessel which needs to stay centered over an offshore oil-well for months on end despite sea states and drilling activity. The MTNW Line Control Instrument (LCI) Mooring Solution allows the rig manager to keep rig positioning to within a very small tolerance for lateral movement. The goal for most rig managers is to maintain movement to within a 12 inch circle while drilling activity occurs. This is a .2% margin for error.

“Without knowing exactly where your anchors are and the tension in your mooring lines, the rig manager can’t accurately position the ship,” said Tom Rezanka, Director of the LCI division of MTNW. “With subsea pipelines crisscrossing the bottom of the ocean and dynamic sea states, mooring line monitoring becomes a necessary part of rig management for personnel and property safety.”

In a traditional mooring setup, if problems occur, the vessel operator will notice a sudden change in position and will attempt to rectify the situation before the ship drifts too far breaking the drill column. Essentially, the operators can only respond to problems after they have occurred, they have no reliable means of predicting them. With MTNW’s mooring line monitoring system, the user can ensure that the tension on the mooring lines is low enough that the anchors are not at risk of shifting while also being high enough to keep the vessel in place; thus minimizing the chances of an anchor slip. In addition to this functionality, MTNW’s system can also monitor the payout of the line which enables the operators to accurately place buoys (with accuracy better than 30cm) to lift the mooring lines over subsea cables and pipelines.
 

Email AddThis Feed Button Share
Maritime Reporter January 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Technip Nets Petrobras Equipment Agreement

Technip was awarded a 5-year frame agreement contract from Petróleo Brasileiro S.A. (Petrobras) for the supply of around 1,400 kilometers of flexible pipes.

HB Rentals Completes Trinidad Offshore Work

Offshore accommodation specialist,  HB Rentals, a Superior Energy Services company, has completed an eight-building and heliport package on a fixed platform in offshore Trinidad,

Atwood Oceanics Wins Contract Offshore Israel

Atwood Oceanics sadi that one of its subsidiaries has been awarded a drilling services contract by Shemen Oil and Gas Resources Ltd., an Israel-based oil and gas company, for the Atwood Beacon.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright