Foss Pioneers New Route on Columbia River

Wednesday, September 30, 2009
File Photo courtesy Foss
Photo courtesy Foss

Foss pioneered a new commercial route deep into Canada on the Columbia River in August, navigating through strong currents and shallow water to safely deliver a new 190-ton turbine for British Columbia’s largest hydro-electric dam.

In 2002, Foss became the first to use the upper Columbia for commercial navigation, demonstrating its ability to operate in extreme environments by towing a 135-ton turbine from Coulee City to Trail, B.C. just north of the boarder.  This summer’s trip was about 155 miles farther upriver.

“We put together a great experienced team with local knowledge and we know what we’re doing up there,” said Tim Beyer, Foss director of regional towing, who managed the move. “Our team is as good as it gets for this kind of job.”

The voyage took a small convoy up Lake Roosevelt and then through the river to Northport. After crossing the border, the boats passed Waneta Dam, where the Pend Oreille river flows into the Columbia, then traveled stretches of the narrow river below, between and above the Arrow Lakes before arriving in Shelter Bay, where the turbine was unloaded at a ferry landing. It was carried from there over land to the hydro plant by a prime mover.

The tug skippers were in direct communication with B.C. Hydro representatives, who made the trip possible by regulating the flow of water through three dams above several critical areas to manipulate and minimize currents.

Later, B.C. Hydro helped the group through Tin Cup Rapids by increasing the flow of the Kootenay River. The Kootenay flows into the Columbia slightly downstream from the rapids, and increasing its volume had the effect of creating a dam, both deepening the water in the rapids and slowing it down.

The journey into Canada was the last leg of a long trip for the turbine. It was manufactured in Brazil and arrived by ship in Vancouver, Wash., and Foss towed it aboard the barge 185 C-3 to Pasco with the tug Lewiston. From there, a Prime Mover moved it over land to Coulee City.

(www.foss.com)

Email AddThis Feed Button Share
Maritime Reporter January 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Ampol Completes Unique Skimmer Vessels

American Pollution Control Corp. (AMPOL), completed the acquisition and reconstruction of a newly restored shallow water skimmer vessel. Unique in its design and engineering,

Moray First Marine Continues to Grow

Moray First Marine based in Lossiemouth on the Moray Firth has recently seen the delivery of a second boat allowing them to take on a greater, more varied workload

Damen Launches Fishery Inspection Vessel

Fishery Inspection Surveillance Vessel for Angola launched at Damen Shipyards Galati.   Damen Shipyards Galati is building the Ngola Kiluange, a Fishery

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright