DP-08 Reaches Stage Two

Thursday, February 25, 2010
File Photo courtesy Diverse Projects
Photo courtesy Diverse Projects

Diverse Projects' Build Project 08 was recently transported overland from its construction facility at Profab Engineering in Palmerston North, to Napier. It was one of New Zealand’s largest ever over land yacht movements. Diverse Projects took on the challenge in keeping with their virtual shipyard approach, moving projects between facilities to achieve best outcomes overall in both quality and value, an approach similar to that of larger European yards. Tranzcarr Heavy Haulage moved the vessel over three nights, beginning Oct. 18. The move was no mean feat, on a large transporter able to carry max 55 tons, well laden with the now 52 ton boat, and negotiating New Zealand's narrow windy roads in darkness.

Once safely in Napier, the hull and superstructure were welded together. The next challenge was to put the boat in the water and tow it to Whangarei for completion of the interior, paintwork and finishing details. The trip up the coast took three days: once attached to the towing vessel, the boat could not be boarded. One of Diverse Projects' owners, John Vitali, and the yacht’s captain actually remained on board for the whole trip. Once in Whangarei, DP-08 was settled in her new home and will stay in the Whangarei shed until the completion of the project late 2010.

DP-08 was designed by Craig Loomes of LoMocean Design. The 103.3 ft long range motor yacht is being built to Germanischer Lloyd 100 A5 class and MSA survey. With twin Caterpillar C18 ACERT 600 hp engines, she will cruise at 12.5 knots. The interior has been designed by Australian based Chris Connell and manufactured by SMI Group of New Zealand to complete the picture of very best quality all round.

(www.diverseprojects.com)

Email AddThis Feed Button Share
Maritime Reporter January 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Megayachts

164’ (49.9m) Tsumat Launched at Trinity Yachts

Trinity Yachts has announced its first launch of 2012: Tsumat, a 164’ (49.9m) Tri-Deck custom built superyacht with aluminum hull and superstructure.

ISS Names Board of Directors

Change in Organization’s Bylaws Specify Revised Board Tenure and Structure.     The ISS (International Superyacht Society) announces its 2012-2015

Trinity Yachts: The Year in Review, The Year Ahead

In a global economic climate which might merely be described as awkwardly viable, Trinity Yachts continues to set a remarkable pace in custom superyachts launched

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Sonar
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright